Click on a thumbnail to enlarge the image.
|
|
|
|
|
|
The Lodge has long suffered from "deferred maintenance" as the Council does not allocate funds to its upkeep since the Lodge is not a program area directly benefiting the scouts. Each winter, the Lodge gets flooded by snow melt seepage, consequently, the Lodge has suffered a lot of damage. For these and many other reasons, the initial focus of The Fund backed projects will be Stern Lodge. As an inaugural project, The Fund has completed construction of a drainage system cut into the granite around the lodge's exterior. This will keep spring snow melt from draining through the building that causes so much damage year after year. Also, repair of the stone foundation will be done as needed. Future projects may include a new roof, replacement siding, and interior renovations.
|
|
|
|
Repair water damage in bathroom |
Repair water damage in wood and mouldings in south part of lodge |
Repair drywall damage in kitchen |
Repair/replace everything in kitchen |
Clean up fireplace, fix roof and stone leaks |
Repair water damage to doors and mouldings |
|
|